100G data center interconnect
A planning concept for short-reach 100G switch links: how to record the fiber path, size the optical budget and shortlist QSFP28 optics or DAC.
Open the concept
Applications
Ten worked application concepts: what to document, which product families to evaluate, how the optical budget behaves and what belongs in the BOM. These are engineering references, not customer case studies.
A planning concept for short-reach 100G switch links: how to record the fiber path, size the optical budget and shortlist QSFP28 optics or DAC.
Open the conceptHow to plan a multi-building campus backbone: fiber survey, 10G uplink classes, gigabit edge links and an optical budget that survives future re-patching.
A reference plan for halving strand use with BiDi optics: matched wavelength pairs, budget arithmetic and media converters at the far end of the drop.
A staged plan for replacing distance-limited copper runs with fiber: where converters fit, where copper SFP modules fit, and how to phase the cutover.
How to plan 25G server-to-leaf links: adapter and switch inputs, SR versus LR selection, breakout from 100G, and acceptance against FEC counters.
Planning network connectivity inside plant cabinets: temperature grades, DIN-rail switches, DC supply, vibration and fiber uplinks out of the noise floor.
A planning reference for camera backhaul over fiber: bandwidth per stream, converter placement, single-fiber drops and recorder-side aggregation.
A planning concept for point-to-point gigabit access built on BiDi SFP optics: wavelength plans, aggregation sizing and subscriber-side termination.
Planning links of 80 to 120 km: 1550 nm budgets, APD receivers, chromatic dispersion, amplification choices and the measurements that must precede ordering.
Planning powered edge devices outdoors: PoE class budgeting, temperature grades, DC supply sizing, surge exposure and where the fiber boundary belongs.
Note
Every page on this list describes how a class of link is planned and specified. None of them claims a delivered customer project, a named site or a measured result.
Next step
Send the architecture, the distances and the host platforms. We will work through the configuration with you.